Privacy Fence Installation
Six and eight foot screens of wood or vinyl boards, set on deep posts, stepped or racked to the yard, with a gate that still closes after a winter.
Topeka Quality Fence offers fence installation and repair in Auburn, KS, and that covers privacy fences, fence replacement and gate repair for Auburn homes.
Request a quote
Say where the fence goes and what it has to keep in or out. Someone calls back with a per-foot range.
Roughly 100 split-level homes went up in Auburn between 1975 and 1985, and nearly half of the town's homes date from the 1970s. A split-level usually sits on a slope, so the fence behind it has to climb or step down the yard instead of running flat.

A fence put up with one of those split-levels would be close to 40 years old or more by now. Two kinds of work fit these sloped lots best.

On a steep yard we step the panels, so each one sits level and a few inches lower than the last. On a gentle slope we rack them instead. The rails follow the ground and leave no triangle gaps at the bottom for a dog to squeeze under.

When two neighbors split a fence on the line, we price it once and show both of them the same plan. A shadowbox or board-on-board style looks finished from both sides. So nobody ends up with the back of the fence.
About 14% of the ground around Auburn is Sogn and Vinland soil. In the Sogn soil, limestone starts about 7 inches down, and an ordinary auger stops right there. So we drill those holes with a rock bit, or core them, before the post goes in. That way it still gets its full depth and concrete all around it.
Martin silty clay loam covers almost half the ground around Auburn. A post set in a small plug of concrete in that clay gets pushed as it swells and shrinks, year after year, until the plug cracks or rolls and the post leans. Each old post comes up with its concrete instead of being cut off at the ground, since a stub left behind blocks the new hole. After that, the new posts go into wider holes with gravel under them. And the concrete is shaped to shed water away from the wood.
Auburn’s code names fences among the work that needs a permit. Once the building official approves the plan, the city clerk issues it. The city builds under the 2021 International Residential Code.
Auburn is about 28 minutes southwest of Topeka, 14 miles by road.
We also serve Carbondale, KS, a former coal town down US-75, south of Topeka.
Auburn has a population of about 1,272. Here is what that means for the work we do here.
| Local fact | Detail |
|---|---|
| Homes built in the 1970s | 47% of the city's 486 homes; the median home dates from 1978. |
| Homes built before 1960 | 4.9%, the fewest on our list. |
| Soils around the center | Martin silty clay loam (46%), Labette silty clay loam (14%), and Sogn-Vinland soils over rock (14%). |
| Sogn soil | Limestone about 7 inches below the surface. |
| Fence permit | $5 per $1,000 of the job's cost, at least $5 and at most $200. |
| Rented homes | 46.3% of occupied homes; 66.3% are single-family detached. |
Six and eight foot screens of wood or vinyl boards, set on deep posts, stepped or racked to the yard, with a gate that still closes after a winter.
Cedar and pressure-treated pine fences, from shadowbox and picket to split rail, on posts rated for the ground and stained only once the boards have dried.
White, tan or gray vinyl in privacy, picket, shadowbox and ranch rail styles, with a screw locking each rail end, so a Kansas gust leaves the section standing.
Bare galvanized or dark coated mesh on concrete-footed posts, pulled tight, with a coil wire low down for dogs that push, and gates hung square.
Walk gates and driveway pairs hung on posts made for the load, plus repairs for gates that sag, drag or stopped latching.
Aluminum fence for front yards and pool barriers, with pool gates hung to swing out and latch by themselves, built to the pool code Topeka adopts.
Tell us roughly how many feet you need, how tall, and the material you have in mind. We call back with a per-foot range and what would move it: gates, a slope, or an old fence to tear out first.
Racked looks smoother on a gentle slope, and it leaves no gaps. Stepped works on any slope and suits vinyl and aluminum panels, which can't bend much. But it does leave gaps under each step.
That depends on where it sits and what the two of you agreed. If you split the cost, put the split in writing before the work starts. A fence set just inside your line is yours alone.
We can match the height and the board style. The old rails and boards were usually rough-cut, though. New lumber looks cleaner and lighter until it weathers.
Not a solid one. Auburn's zoning wants a fence in front of the front setback to be at least 60% open. So a picket or ornamental style goes there, and the privacy fence starts behind it.
Yes. We cut the wire or boards out around the trunk and leave the piece grown into the bark, since pulling it can hurt the tree.
About the same as on flat ground, if each post is set plumb and the panels are stepped, not forced to follow the slope. Forced panels crack at the rail joints.
Call (785) 329-9250 to talk it through now, or describe the fence here for a callback.